Successful Project Management Trigen Solutions Inc.
From small to large scale projects we have built a reputation for continuing to efficiently complete projects to client satisfaction through our technical and management expertise in the energy industry. Check out some of the following projects to learn more.
Chevron Canada Resources - Kaybob Duvernay Field Coordination of Management of Change (MOC) Projects
Chevron Canada has an industry-leading position in the Kaybob Duvernay resource play near Fox Creek, Alberta, approximately 260 km northwest of Edmonton. Chevron Canada has a 70 percent owned and operated interest in approximately 330,000 acres in the liquids-rich Duvernay formation. KUFPEC Canada Inc, a wholly owned subsidiary of the Kuwait Foreign Petroleum Exploration Company, also holds a 30 percent non-operated interest in Chevron Canada’s Duvernay lease holdings. In this contract position to Chevron, our responsibilities centered around Field Coordination for the execution and construction of Management of Change (MOC) projects within the Kaybob Duvernay field facilities.
Tervita Corporation
Project Management
Civil, Structural, Mechanical, Electrical & Instrumentation
Buck Lake Treatment, Recovery & Disposal (TRD) Facility
This project encompassed full supervisory control for the installation of an added butane storage and associated blending capabilities, along with the civil construction involved for the transport access to the associated truck loading facilities.
La Glace Landfill Tailings Pond Treatment Facility
This project for Tervita entailed the oversight and implementation of the complete construction work package for the design basis of treating the landfill tailings through a prototype vaporizer treatment unit.
AltaGas Ltd. - PMT Electrical & Instrumentation Supervision
Townsend Gas Processing Facility T2A Expansion
The construction of the AltaGas “Townsend 2A” Gas Plant Facility included a 2803 e³m³/d (99 MMscf/d) sweet gas processing plant, and the retrofitting of the existing AltaGas “Townsend 1” Gas Plant Facility to accommodate select shared utilities with Townsend 2A. The project itself consisted of the design, construction, and start up a new shallow cut sweet natural gas liquids plant facility adjacent to the existing T1 Gas Plant.
C41-F North Compressor Station
This facility was sized to receive 5606 e³m³/d (198 MMscf/d) of raw sweet inlet gas, delivering a high-pressure two-phase product to the Townsend Gas Plants. The C41-F compressor station is located approximately 23 km north of the existing AltaGas Townsend 1 Gas Plant & T2A Expansion; both of which are located approximately 135km north west of Fort St John, BC
Chevron Canada Resources Liard Horn River
Project Management
Electrical & Instrumentation Inspection
This project for Chevron involved the completion and commissioning of the well sites, pipeline and production facilities for the d28-A/94-O-12 & b3K-F/94-O-12 wells located in the prolific gas field of the Liard Horn River Resources area north of Fort Nelson, BC. The wells themselves each had an approximate shut-in pressure of 96,000 kPag and a maximum temperature of 140 ̊C with initial production of 1,700 e3m3/d (60 MMscf/d) gas and 611 m3/d water. The design of the production facilities was such that they received raw gas, separated the free water, dehydrated, metered, and delivered sales quality gas into pipeline. The facility equipment was designed to process initial production rates of the well to a sales gas quality specification of 4 lb-H2O/MMscf.
Dedicated to Project Execution & Quality Assurance